Simulation and analysis of induced voltage and induced current on overhead ground wire of Jindongnan-Nanyang-Jingmen 1000kV UHV AC transmission line

机译:晋东南-南阳-荆门1000kV特高压交流输电线路架空地线上感应电压和感应电流的仿真分析

获取原文

摘要

With continuous development of UHV transmission technology and increasing of UHV transmission project, UHV will be one of the main power transmissions in China. China's first UHV single-circuit transmission line Jindongnan-Nanyang-Jingmen AC transmission project has been completed and put into operation successfully. Due to the spatial location of UHV transmission line and overhead ground wire on it, induced voltage and induced current generate in the ground line through electromagnetic and electrostatic coupling by transmission circuit. Induced voltage and induced current on overhead ground wire of Jindongnan-Nanyang-Jingmen 1000kV AC line are calculated by EMTP in this paper. Besides, factors such as distance between conductor wire and ground wire, transmission power and segment length of insulated ground wire;that affect induced voltage and induced current on overhead ground wire are analyzed in this paper. This paper can provide a reference for many aspects of UHV transmission line, such as maintenance work, live line work, and rational utilization of induced voltage and induced current.
机译:随着特高压输电技术的不断发展和特高压输电项目的增加,特高压将成为中国主要的动力传动系统之一。中国第一条特高压单回路输电线路晋东南-南阳-荆门交流输电工程已经建成并成功投运。由于特高压输电线和架空地线上的空间位置,通过传输电路的电磁和静电耦合,在地线上会产生感应电压和感应电流。利用EMTP计算了金东南—南阳—荆门1000kV交流架空架空地线上的感应电压和感应电流。此外,还分析了导体与地线之间的距离,传输功率和绝缘地线的线段长度等因素,这些因素会影响架空地线上的感应电压和感应电流。本文可为特高压输电线路的许多方面提供参考,例如维护工作,带电工作以及合理利用感应电压和感应电流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号