首页> 外文会议>2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies >Influences on CPS frequency evaluation indexes after large scale wind power joining up to East China power grid
【24h】

Influences on CPS frequency evaluation indexes after large scale wind power joining up to East China power grid

机译:大型风电并入华东电网后对CPS频率评估指标的影响

获取原文

摘要

Influenced by the energy crisis and environmental stress, wind power is growing rapidly for its mature technology and good economic returns. East China Power Grid is planning to construct million kW level wind power base in northern Jiangsu coastal areas. As one kind of intermittent energy, wind power's output changes as wind speed. When wind power is in a small proportion of total power generation, unbalance energy caused by wind power's fluctuations usually can be illustrated in Jiangsu power grid. At that time, the power and frequency deviation of connection lines is small and only brings little effects to ACE, which will not cause CPS1 and CPS2 assessment index inadequate. But when wind power capacity reaches a certain proportion, only relying on the regulation of AGC ability of Jiangsu generators cannot recover power balance in time, and more conventional units reserve is required. In order to keep ACE in a rational range, artificial adjustment by dispatchers is the only choice. Due to the fact that the speed of artificial adjustment cannot follow wind power output change, it may cause CPS assessment index unqualified. This paper amends formula of ACE calculation considering wind power output fluctuations. Although wind power is still dispatched by Jiangsu power dispatching center, this paper separates wind power from East China power dispatching region virtually, and establishes a virtual line between wind power and Jiangsu region. In the future by 2020, wind power capacity installed at Jiangsu grid will reach to 10 million kW, the contradictions between assuming responsibilities and getting benefits brought by consuming abundant wind power will be more apparent at the same time, so some reasonable arrangement should be made ahead. This paper also presents some corresponding suggestions.
机译:受能源危机和环境压力的影响,风力发电以其成熟的技术和良好的经济效益而迅速发展。华东电网计划在苏北沿海地区建设百万千瓦级风力发电基地。风能作为一种间歇性能量,其输出随风速而变化。当风电在总发电量中所占的比例很小时,通常可以在江苏电网中说明由风电波动引起的不平衡能量。那时,连接线的功率和频率偏差很小,对ACE的影响很小,不会导致CPS1和CPS2评估指标不足。但是,当风电容量达到一定比例时,仅依靠江苏发电机AGC能力的调节就不能及时恢复电力平衡,需要更多的常规机组储备。为了将ACE保持在合理范围内,调度员进行人工调整是唯一的选择。由于人为调整的速度不能随风能输出的变化而变化,有可能导致CPS评估指标不合格。本文修正了考虑风电输出波动的ACE计算公式。尽管风电仍由江苏省电力调度中心调度,但本文将风电与华东电力调度区虚拟地分开,在风电与江苏地区之间建立了一条虚拟的线。预计到2020年,江苏电网风电装机容量将达到1000万千瓦,同时承担责任与消耗大量风电带来的利益之间的矛盾将更加明显,因此,应做出合理的安排先。本文还提出了一些相应的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号