首页> 外文会议>International conference on information computing and applications >Directional Drainage Grouting Technology of Coal Mine Water Damage Treatment
【24h】

Directional Drainage Grouting Technology of Coal Mine Water Damage Treatment

机译:煤矿水害防治定向排水注浆技术

获取原文

摘要

Grouting has become an important and effective means of prevention and treatment to mine water disaster. Explore the rapid and efficient mechanism and grouting technology for coal mine water control work has great significance. This paper proposed directional drainage grouting based on Grouting mechanism and practice experience. It could be used for tunnel closure, collapse column water inrush and "four-fuzziness" (measurements are not allowed, water inrush source uncertainty, water inrush location is unknown and leading water channels is unclear) mines. And the water grouting mechanism and key techniques are discussed in detail. The water disasters treatment of Renlou coal mine and Tianhe coal mine showed that directional drainage grouting have high efficiency, save materials, large safety factor and so on. It has broad application prospects.
机译:注浆已成为防治矿井水害的重要有效手段。探索快速有效的注浆机理和注浆技术对煤矿水质控制工作具有重要意义。本文基于灌浆机理和实践经验,提出了定向排水灌浆技术。它可用于隧道关闭,塌陷柱状突水和“四模糊”(不允许测量,突水源不确定,突水位置未知,前导水道不清楚)矿井。并详细讨论了注水机理和关键技术。仁楼煤矿和天河煤矿的水灾治理表明,定向排水注浆具有效率高,节省材料,安全系数大等优点。具有广阔的应用前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号