首页> 外文会议>2011 Second International Conference on Mechanic Automation and Control Engineering >Application research on construction technology of spin dig cast-in-place pile based on the spin dry homework
【24h】

Application research on construction technology of spin dig cast-in-place pile based on the spin dry homework

机译:基于旋转干作业的旋挖现浇桩施工技术的应用研究

获取原文

摘要

It is applicable to use spin dig cast-in-place concrete piles based on the spin dry homework in soil with good soil orthostatic and no groundwater in the hole. Holes can be finished without slurry-supported measures. It is formed directly with wide application. The construction of pile foundation in LSTJNO.3 of LuoYang to LuanChuan freeway was researched and analyzed in this article. Through the technology research and the common problem analysis, the corresponding methods and treatment measures were putted forward.
机译:适用于在土壤直立性良好,孔内无地下水的土壤中使用基于旋干作业的旋挖现浇混凝土桩。无需浆料支持的措施即可打孔。它是直接形成的,具有广泛的用途。本文对洛阳至栾川高速公路LSTJNO.3的桩基施工进行了研究和分析。通过技术研究和常见问题分析,提出了相应的方法和处理措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号