首页> 外文会议>ICONE18;International conference on nuclear engineering >Study on Schedule Control in APIOOO Nuclear Plant Project
【24h】

Study on Schedule Control in APIOOO Nuclear Plant Project

机译:APIOOO核电站项目进度控制研究

获取原文

摘要

The construction of APIOOO Nuclear Power Plant (NPP) has commenced in China. The APIOOO NPP features a passive design concept and modular construction technology. Based on the management of the construction of current APIOOO NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The APIOOO NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support.
机译:APIOOO核电站(NPP)在中国已经开始建设。 APIOOO NPP具有被动设计概念和模块化构造技术。基于当前APIOOO NNP的建设管理,本文描述了模块化建设技术以及新的建设技术和方法对核岛(NI)建设项目管理的影响。本文对不同层次的核岛建设施工进度管理提出了新的要求。 APIOOO NI的构建逻辑以土建和结构安装的并行构建为主要方法,并以模块制造,组装和安装的集成时间表作为支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号