首页> 外文会议>ICONE18;International conference on nuclear engineering >OPTIMIZATION OF PRODUCTION PLAN AND RISK CONTROL IN QINSHAN III NPP
【24h】

OPTIMIZATION OF PRODUCTION PLAN AND RISK CONTROL IN QINSHAN III NPP

机译:秦山三期核电厂生产计划的优化与风险控制

获取原文

摘要

Optimized and improved measures have been implemented in Qinshan III NPP to optimize the management of routine production plan, strengthen maintenance work risk analysis, and improve the plan execution capability, which involve unified management of generation, refuelling, periodic test and maintenance plans, simplifying the defect scales and reducing interlinks of defect disposal, intensifying the assessment on plan execution and adopting performance evaluation and star rating measures.
机译:秦山三号核电厂已实施优化和改进措施,以优化日常生产计划的管理,加强维护工作风险分析,提高计划执行能力,这涉及到发电,加油,定期测试和维护计划的统一管理,从而简化了生产计划。缺陷规模和减少缺陷处置的相互联系,加强对计划执行的评估,并采用绩效评估和星级评定措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号