首页> 外文会议>International high-level radioactive waste management conference;IHLRWMC 2011 >YUCCA MOUNTAIN 2008 PERFORMANCE ASSESSMENT:INCORPORATION OF SEISMIC HAZARD CURVE UNCERTAINTY
【24h】

YUCCA MOUNTAIN 2008 PERFORMANCE ASSESSMENT:INCORPORATION OF SEISMIC HAZARD CURVE UNCERTAINTY

机译:Yucca山2008年性能评估:地震危险曲线的不确定性

获取原文

摘要

The possible effects of epistemic uncertainty in the seismic hazard curve used in the 2008 performance assessment (PA) for the proposed repository for high-level radioactive waste at Yucca Mountain (YM), Nevada, are investigated. The analysis establishes that it is possible to propagate epistemic uncertainty in the seismic hazard through the computational structure used in the 2008 YM PA and to investigate the effects of this uncertainty on expected dose to a reasonably maximally exposed individual from seismic ground motion events with sensitivity analysis procedures based on Latin hypercube sampling, partial rank correlation, and stepwise rank regression. The dominant analysis inputs affecting the epistemic uncertainty in the indicated dose were found to be the residual stress level at which stress corrosion initiates in the Alloy 22 outer corrosion barrier for waste packages and the seismic hazard curve.
机译:对于内华达州尤卡山(YM)的高放射性废物拟议处置库,在2008年性能评估(PA)中使用了地震危险曲线中的认识不确定性可能产生的影响进行了调查。分析确定,可以通过2008 YM PA中使用的计算结构来传播地震危险中的认识不确定性,并通过敏感性分析来调查这种不确定性对合理最大程度暴露于地震地面运动事件的个体的预期剂量的影响。基于拉丁超立方体采样,部分秩相关和逐步秩回归的程序。发现在指示剂量下影响认知不确定性的主要分析输入为残余应力水平,在该残余应力水平下,废包装的Alloy 22外腐蚀阻隔层中会发生应力腐蚀,并产生地震危险曲线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号