首页> 外文会议>Annual International Bridge Conference >Design of the New Millennium Cable-Stay ed Bridge in South Korea
【24h】

Design of the New Millennium Cable-Stay ed Bridge in South Korea

机译:韩国新千年电缆留桥设计的设计

获取原文

摘要

The New Millennium Bridge project was launched in the south-western part of Korea. The cable stayed bridge in Lot1 is a FCM-anchored hybrid two-pylon cable stayed bridge with a main span of 510m. A distinct feature of the bridge is its high(195m) and low(135m) pylons with three bundle cables in the side span. The Link is directly exposed to the West Sea, and the site is characterized by strong wind during typhoons events.
机译:新的千禧桥梁项目在韩国南部推出。 Lot1中的电缆保持桥1是FCM锚定的混合动力双塔电缆停留桥,主要跨度为510米。 桥的一个不同的特征是其高(195米)和低(135米)的塔架,侧跨度有三个束缚电缆。 该连杆直接暴露在西海,该网站在台风活动期间的风力强劲。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号