Accelerated Design/Build of the SEPTA Crum Creek Viaduct

机译:加速设计/梧桐溪高架桥的建设

获取原文

摘要

The Crum Creek Viaduct Replacement Project is a unique accelerated bridge design/build project that replaced a bridge on an existing alignment. The design/build approach to replace the 121-year old rail viaduct bridge on the busy Media-Elwyn Regional Line in Delaware County over the Crum Creek waterway was accomplished for the Southeastern Pennsylvania Transit Authority (SEPTA). The new steel girder bridge has five spans and is 735’ long with a maximum span length of 157’. A Bridge Monitoring System was installed on the existing structure to monitor movements of the existing bridge as well as the stability of the steep slopes during construction. The Design/Build Team provided innovative solutions to designing and delivering the new bridge on-time with a fast-paced schedule, which only permitted a eleven-week rail shut down to allow completion of existing bridge demolition, superstructure and deck erection, rail work, catenary electric transmission, and signal system installation. During the eleven-week shutdown, work was performed on a 24-hour a day, 7-day a week schedule. The aggressive project schedule required daily coordination between the owner, contractor and designer to ensure permitting, design and site access remained on schedule. The new bridge girders were assembled on one side of the existing bridge, including the precast deck and were supported by new straddle bents built under the existing bridge while the existing bridge remained in full operation. The lateral slide Accelerated Bridge Construction technique was used to move the new bridge into place. Dramatic video shows how it was all accomplished.
机译:Crum Creek Viavuct替换项目是一个独特的加速桥梁设计/构建项目,在现有对齐方面取代了桥梁。在宾夕法尼亚州东南部的宾夕法尼亚州过境管理局(SEPTA)为代替Delaware County的繁忙Media-Elwyn区域线上的121岁的铁路高架桥桥上取代了121岁的媒体电视桥。新型钢梁桥有五个跨度,735英寸长,最大跨度长度为157'。桥梁监控系统安装在现有结构上,以监测现有桥梁的运动以及施工期间陡坡的稳定性。设计/构建团队为使用快节奏的时间表设计和提供新的桥梁设计和提供新的桥梁,仅允许一家十一周的轨道关闭,以完成现有的桥拆卸,超大建设和甲板勃起,铁路工作,延伸电动传输和信号系统安装。在十一周关闭期间,工作在每天24小时,每周7天的时间表进行。攻击性项目计划要求所有者,承包商和设计师之间的每日协调,以确保允许的允许,设计和站点访问按计划仍然存在。新的桥梁组装在现有桥梁的一侧,包括预制甲板,并由现有桥梁下方的新跨箱支撑,而现有桥仍然全操作。横向滑动加速桥梁施工技术用于将新桥梁移动到位。戏剧视频显示了如何完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号