【24h】

Wuli-Shili-Rili Risk Factors in ERP Project Implementation

机译:w U里-shi里-RI离risk factor sin ERP project implementation

获取原文

摘要

This paper adopts Wuli-Shili-Renli (WSR), an oriental system methodology, to analyze the ERP project implementation in China's situation. It studied the existence risk factors in ERP project implementation in China with literature analysis and experts survey, the key risk factors of them through questionnaire survey, and the relationship among the key risk factors with Interpretive Structural Model(ISM). The paper finds 51 risk factors in 19 categories, 10 key risk factors in 6 layers with olive structure. The risk of manager's concept is on the basic layer which impact ERP project implementation with indirect way, and the risk of process changes is on the top layer which impact with direct way.
机译:本文采用东方系统方法Wuli-Shili-Renli(WSR)来分析中国情况下的ERP项目实施情况。通过文献分析和专家调查研究了中国ERP项目实施过程中存在的风险因素,通过问卷调查研究了其中的关键风险因素,以及与解释性结构模型(ISM)的关系。本文在19个类别中找到了51个危险因素,在6层橄榄色结构中找到了10个关键危险因素。管理者概念的风险位于以间接方式影响ERP项目实施的基础层,而流程变更的风险则以直接方式影响ERP项目的顶层。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号