首页> 外文会议>IEEE international conference on advanced management science;IEEE ICAMS 2010 >Integrated Production and Delivery Scheduling Problem with Two Competing Agents
【24h】

Integrated Production and Delivery Scheduling Problem with Two Competing Agents

机译:具有两个竞争代理的集成生产和交货计划问题

获取原文

摘要

In the supply chain management, besides the coordination job scheduling and finished goods delivery decision maker need consider the balance between the agents(customers) competing for a common processing resource. In the case of two agents, competing to perform their respective nonpreemptive jobs on a single machine in the plant, this paper considers the objective to minimize the total job arrival times, i.e., the sum of time between job's release and delivery to the corresponding agent, in the constrained optimization form. After investigating the properties of the optimal solution, we show the complexity of the problem, and present the dynamic programming algorithm.
机译:在供应链管理中,除了协调工作计划和成品交付决策者外,决策者还需要考虑代理商(客户)之间争夺共同处理资源的平衡。对于两个代理商,他们竞争在工厂的一台机器上执行各自的非抢占性工作,因此本文考虑的目标是最大程度地减少总的工作到达时间,即,从任务下达到交付给相应代理商之间的时间之和。 ,以受限的优化形式。在研究了最优解的性质之后,我们展示了问题的复杂性,并提出了动态规划算法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号