Numerical analysis for a slope reinforced with one row of piles

机译:一排桩加固边坡的数值分析

获取原文

摘要

3D numerical analysis is presented for a slope reinforced with one row of piles by the threedimensional elasto-plastic shear strength reduction finite difference method. The numerical results show that the factor of safety increases with the decrease of piles spacing, and the piles becomes more like a barrier and the influence of soil arching becomes more pronounced as the pile spacing decreases. The critical slip surface is found to be divided into two parts when the pile spacing is small, and these two parts gradually get connected with the increase of pile spacing until a clear critical slip surface is formed. The shear strength reduction finite difference method indicates that the pile row needs to be installed in the middle of the slope for maximum safety.
机译:通过三维弹塑性抗剪强度折减有限差分法,对一排桩加固的边坡进行了三维数值分析。数值结果表明,随着桩距的减小,安全系数增大,桩距越小,桩越像障碍物,土拱效应越明显。当桩距较小时,发现临界滑移面可分为两部分,随着桩距的增大,这两个部分逐渐联系在一起,直到形成清晰的临界滑移面。剪切强度折减有限差分法表明,为了最大程度地确保安全,需要将桩排安装在斜坡的中间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号