首页> 外文会议>35th IEEE Photovoltaic Specialists Conference >Long-term performance of the first grid-connected, building-integrated amorphous silicon PV installation in Brazil
【24h】

Long-term performance of the first grid-connected, building-integrated amorphous silicon PV installation in Brazil

机译:巴西首个并网,建筑物集成的非晶硅光伏装置的长期性能

获取原文

摘要

In this paper we present the performance assessment of the first grid-connected, building-integrated, thin-film PV system installed in Brazil in 1997. In the 12-years period since start up, the 40m2, 2kWp double-junction amorphous silicon BIPV generator operated continuously, with minimum downtime and high performance ratios. We also discuss reliability issues related to system design and inverter performance and replacement for the continuous operation of this distributed energy source in the urban environment of a warm-climate metropolitan state capital in Brazil.
机译:在本文中,我们介绍了1997年在巴西安装的首个并网,建筑集成的薄膜光伏系统的性能评估。在启动后的12年内,40m 2 ,2kWp双结非晶硅BIPV发电机连续运行,停机时间最短,性能比更高。我们还将讨论与系统设计和逆变器性能有关的可靠性问题,以及在巴西一个温暖气候的大都市州首府的城市环境中该分布式能源的持续运行所需要的替代方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号