首页> 外文会议>2nd IEEE Energy Conversion Congress and Exposition >Real-time measurement of power quantities under sinusoidal and non-sinusoidal conditions for single-phase systems
【24h】

Real-time measurement of power quantities under sinusoidal and non-sinusoidal conditions for single-phase systems

机译:单相系统在正弦和非正弦条件下的电量实时测量

获取原文

摘要

This paper describes the real-time implementation of a time-domain method to calculate the power quantities based on IEEE 1459-2000 for single-phase systems under sinusoidal and non-sinusoidal conditions. The proposed method is based on recursive implementation of Park transformations for the detection of fundamental and harmonic components of voltage and current. The technique employs a recursive algorithm that avoids the low-pass filtering stage which causes uncertainty and delay in the conventional Park transformation based approaches making real-time measuring of the quantities possible with very good accuracy and reduced delay. The performance of the method is confirmed by simulated using MATLAB/SIMULINK and selected results are presented. Moreover, the proposed technique is implemented on a PC-based instrument in order to investigate its accuracy in the presence of measurement transducers.
机译:本文介绍了一种基于时域方法的实时实现,该方法基于正弦和非正弦条件下基于IEEE 1459-2000的单相系统计算功率量。所提出的方法基于Park变换的递归实现,用于检测电压和电流的基波和谐波分量。该技术采用了一种递归算法,该算法避免了在基于常规Park变换的方法中导致不确定性和延迟的低通滤波阶段,从而可以以非常好的准确性和减少的延迟进行实时量的测量。通过使用MATLAB / SIMULINK进行仿真确认了该方法的性能,并给出了所选结果。此外,在基于PC的仪器上实施所提出的技术,以便在存在测量传感器的情况下研究其准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号