首页> 外文会议>IEEE 10th International Conference on Computer-Aided Industrial Design Conceptual Design (CAID CD 2009) >Study on Fitting Gap between Hinge Shaft and Bushing of Earth-machinery’s Working Mechanism
【24h】

Study on Fitting Gap between Hinge Shaft and Bushing of Earth-machinery’s Working Mechanism

机译:土方机械工作机构的铰链轴与衬套之间的间隙研究

获取原文

摘要

There are many hinge points in earth-machinery working mechanism. A reasonable gap between shaft and bushings is so important for the design of working mechanism design. This paper briefly analysed failure mechanism caused by irrationality selection on fittingting gap between hinge shaft and bushings of earthmachinery, such as hydraulic excavator working equipment. A new calculate theory and method on fittingting gap between hinge shaft and bushing was put forward. And the calculate method is proved by analyzing a certain excavator working equipment. The result shows that the method of determining the fittingting gap between hinge shaft and bushing is useful.
机译:土方机械机构中有许多铰接点。轴和衬套之间的合理间隙对于工作机构的设计非常重要。本文简要分析了由于液压挖掘机作业设备等土方机械的铰链轴与衬套之间的配合间隙选择不合理而引起的失效机理。提出了一种新的铰链轴与衬套间隙拟合的计算理论和方法。通过对某挖掘机作业设备的分析证明了该计算方法。结果表明,确定铰链轴与衬套之间的配合间隙的方法是有用的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号