首页> 外文会议>Geotechnical aspects of underground construction in soft ground >Ten years of bored tunnels in The Netherlands: Part I, geotechnical issues
【24h】

Ten years of bored tunnels in The Netherlands: Part I, geotechnical issues

机译:荷兰十年的钻孔隧道:第一部分,岩土工程问题

获取原文

摘要

Ten years have passed since in 1997 for the first time construction of bored tunnels in theNetherlands soft soil was undertaken. Before that date essentially only immersed tunnels and cut-and-covertunnels were constructed in the Netherlands. The first two bored tunnels were Pilot Projects, the 2nd Heinenoordtunnel and the Botlek Rail tunnel. Since then a series of other bored tunnels has been constructed and someare still under construction today. At the beginning of this period, amongst others Bakker et al (1997), gave anoverview of the risks related to bored tunnels in soft ground and a plan for research related to the pilot projectswas developed. After that in 1999 the 2nd Heinenoord tunnel opened for the public, the "Jointed platform forBored tunnelling", in short GPB, was organized, to coordinate further research and monitoring of bored tunnels.This platform is supervised by the Center for Underground Construction. In this paper a summary is given ofsome of the most characteristic observations on these 10 years of underground construction in the Netherlands.In the first part of this paper the focus is on geotechnical interactions, and stability, whereas part two will focusmore on structural related issues.
机译:自1997年以来,已经过去了10年,这是该国首次建造无聊的隧道。 进行了荷兰软土地。在此之前,基本上只有沉浸式隧道和挖填式 隧道是在荷兰建造的。前两个钻孔隧道是试点项目,第二个海涅诺德 隧道和Botlek铁路隧道。从那时起,又修建了一系列其他无聊的隧道,其中一些 今天仍在建设中。在这一时期开始之初,Bakker等人(1997年)提出了 概述与软土地层钻孔隧道有关的风险以及与试点项目有关的研究计划 发展了。此后,1999年,第二条Heinenoord隧道向公众开放,“联合平台 简称GPB,是“无聊隧道”的组织机构,目的是协调对无聊隧道的进一步研究和监测。 该平台由地下建筑中心监督。本文给出了一个总结 关于荷兰这十年的地下建筑的一些最有特色的观察。 在本文的第一部分中,重点是岩土相互作用和稳定性,而第二部分将重点 有关结构性问题的更多信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号