首页> 外文会议>International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology;ECTI-CON 2009 >Electrical major upgrade with power management system implementation for old operating oil on6; gas production plant
【24h】

Electrical major upgrade with power management system implementation for old operating oil on6; gas production plant

机译:电气重大升级,并实施了针对旧运行油的电源管理系统6;天然气生产厂

获取原文

摘要

When power demand is foreseen to rapidly increase in near future, the need to upgrade the electrical system/equipment became apparent. When operation must proceed while any change is in progress, the revision is very difficult. Parallel operation of electrical equipment of various vintages and ratings is inevitable for some extent of time. The special considerations and review on the monitoring, metering and control of new master PLC controller called power management system (PMS) are discussed. Electrical distribution system concepts and equipment modifications and upgrades which improve system operability, enhance reliability and contribute to safety are described.
机译:预计不久的将来电力需求会迅速增加,因此需要升级电气系统/设备。如果在进行任何更改时必须继续进行操作,则修订非常困难。在一定时间范围内,不可避免地会并行运行各种年份和额定值的电气设备。讨论了对称为电源管理系统(PMS)的新型主PLC控制器的监视,计量和控制的特殊注意事项和评述。描述了配电系统的概念以及改进系统可操作性,增强可靠性并有助于安全的设备修改和升级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号