CANE FIELD RESIDUES AS SUPPORT FUEL FOR COGEN BOILER AT PANDURANG CO-OP SUGAR FACTORY - A SUCCESS STORY

机译:甘蔗田渣作为潘多朗合作制糖厂热能锅炉的辅助燃料-成功案例

获取原文

摘要

Shree Pandurang SSKL (Maharashtra), a 3500 TCD crushing capacity sugar mill, had installed a bagasse based 9.4 MW cogen power plant in the year 2006. During the crushing season, which is of about 6 - 7 months, the entire bagasse production is consumed for the operation of the sugar & cogen plant. In the off-season., the power plant operates on bagasse procured from neighbouring mills, the landed cost of which has recently shot up to Rs. 2500 per tonne making the offseason operation unviable.About 100 tonnes of clean cane is harvested per hectare while leaving behind about 7 tonnes of residue (trash) which is burnt after the harvest. The cane tops are, however, collected separately and used as cattle feed.To ensure off-season fuel linkage on a long term basis, facilities were set up in the year 2008, with the financial assistance of the Ministry of New & Renewable Energy, Govt. of India under UNDP-GEF Project on biomass power. The facilities comprise of equipment for baling of cane trash in the fields, for shredding of the baled trash at the factory bagasse yard and for its conveying to the bagasse carrier. The shredded trash is used as a support fuel and blended with bagasse during the crushing season resulting in corresponding saving of bagasse. The bagasse thus saved is again blended with prepared trash (upto 10% of the fuel value of bagasse) and used as fuel for off-season operation of the cogen plant.14 nos. balers have been imported from New Holland (USA). 2 nos. shredders and 2 nos. belt conveyors for feeding the shredded trash to the bagasse carrier have been designed and manufactured locally. The system which commenced commercial operation on 4th Jan 2009 has worked satisfactorily for 3 months in the season and 1 month in the off-season.The gross calorific value of trash is about 3800 Kcal/kg as compared to about 2270 Kcal/kg for mill wet bagasse. In terms of fuel value, 1.0 Kg of cane trash is equivalent to 1.7 Kg of mill wet bagasse.At the current landed cost of about Rs. 1000 per tonne of baled trash, its use as support fuel is remunerative not only for the factory but also for the farmers who are paid net amount of Rs. 100 per tonne of cane trash collected from their farms.
机译:Shree Pandurang SSKL(马哈拉施特拉邦)是一家3500 TCD破碎能力的制糖厂,于2006年安装了一个基于甘蔗渣的9.4兆瓦热电发电厂。在大约6-7个月的破碎季节,整个甘蔗渣的生产都被消耗掉了。用于制糖和热电联产厂。在淡季,发电厂使用从邻近工厂购买的甘蔗渣运行,该工厂的着陆成本最近飙升至Rs。每吨2500澳元,使淡季运营无法进行。 每公顷收获约100吨干净的甘蔗,同时留下约7吨残留物(垃圾),这些残留物在收获后被燃烧。但是,甘蔗皮是单独收集的,可用作牛饲料。 为确保长期与淡季燃料挂钩,政府在新政府和可再生能源部的资助下于2008年建立了设施。开发计划署-全球环境基金生物质能发电项目下的印度国家。这些设施包括用于在田间打包甘蔗垃圾,在工厂甘蔗渣堆场切碎打包好的垃圾并将其输送到甘蔗渣运输机的设备。切碎的垃圾被用作辅助燃料,并在粉碎季节与蔗渣混合,从而相应地节省了蔗渣。如此节省下来的蔗渣再次与准备好的垃圾混合(不超过蔗渣燃料价值的10%),并用作热电联产厂淡季运行的燃料。 14号打包机从美国新荷兰进口。 2个碎纸机和2号用于将切碎的垃圾送入蔗渣运输机的皮带输送机是在当地设计和制造的。该系统已于2009年1月4日开始商业运行,在该季节的3个月和淡季的1个月中均令人满意地工作。 垃圾的总热值约为3800 Kcal / kg,而湿磨甘蔗渣的总热值约为2270 Kcal / kg。就燃料价值而言,1.0千克的甘蔗垃圾相当于1.7千克的工厂湿蔗渣。 目前的降落成本约为Rs。每吨打包废料1000卢比,将其用作辅助燃料不仅对工厂而且对净收入为Rs的农民都是有益的。从他们的农场收集的每吨甘蔗垃圾100英镑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号