Causes and Solutions on Operation Difficulties of No. 5 2000 m3 BF of Handan Iron Steel Co

机译:邯钢5号2000 m3高炉运行困难的原因及对策。

获取原文

摘要

The No.5 BF of Handan Iron & Steel Co failed to smoothly operate since November 2006. It did not work properly until an adjustment was made in May, 2008. The paper analyses the adjustment process and describes the relationship between Smelting and refined material, the characteristics of copper stave and the role of humidified blast, only to be reference for blast furnace of same type.
机译:邯钢5号高炉自2006年11月以来一直未能平稳运行。直到2008年5月进行调整后,它才能正常运行。本文分析了调整过程,并描述了冶炼与精炼材料之间的关系,铜壁的特性和加湿高炉的作用,仅供同类型高炉参考。