首页> 外文会议>INMM annual meeting >Preliminary Planning Considerations Relating to Transportation Security of Nuclear Waste
【24h】

Preliminary Planning Considerations Relating to Transportation Security of Nuclear Waste

机译:有关核废料运输安全的初步规划注意事项

获取原文

摘要

Under the Nuclear Waste Policy Act of 1982, as amended (NWPA), the Department ofEnergy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) wasresponsible for siting, construction and operation of a geologic repository for thepermanent disposal of the nation’s spent nuclear fuel (SNF) and high-level waste (HLW)at the planned Yucca Mountain site. OCRWM was also responsible for safely andsecurely transporting SNF and HLW from numerous sites to the repository. This paperprovides an overview of a number of security considerations applicable to the preliminaryplanning process for such transportation. This paper will briefly discuss general securityrequirements for current DOE shipments and also reviews some of the considerationspertaining to selected transportation risk factors, as discussed by both DOE and otherparties.
机译:根据经修正的1982年《核废料政策法》(NWPA), 能源(DOE)的平民放射性废物管理办公室(OCRWM) 负责选址,建设和运营地质库 永久处置该国的废核燃料(SNF)和高放废物(HLW) 在计划中的丝兰山遗址上。 OCRWM还负责安全和 从众多站点安全地将SNF和HLW传输到存储库。这篇报告 概述了适用于初始安全保护措施的许多安全注意事项 这种运输的规划过程。本文将简要讨论一般安全性 当前DOE装运的要求,并复审了一些注意事项 与指定的运输风险因素有关,如美国能源部和其他机构所讨论的 派对。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号