Equipment Design for the Yunnan-Guangdong UHVDC Project

机译:滇粤特高压直流工程设备设计

获取原文

摘要

The Yunnan-Guangdong ±800 kV UHVDC (Ultra High Voltage Direct Current) Project iscurrently under construction. This link is the world's first HVDC project in the UHV rangeand one of the most important power links in Southern China. It will connect Chuxiong in theYunnan province to Suidong in the Guangdong province over a distance of 1418 kilometres.This project and its new technology present a major step forward in HVDC technology andprovide a new level of efficiency in power transmission.The increase of the transmission voltage level to 800 kV means high requirements on theequipment design. On the one hand side the increased dielectric stresses are to be covered byappropriate design of the insulation. Both, internal and external insulation are to be designedthoroughly. On the other hand increased dimensions of the main equipments lead tochallenges for manufacturing and transportation to site. This paper gives a brief introductionto the project and summarizes design aspects for the main equipment.
机译:云南-广东±800 kV特高压直流(超高压直流)项目是 目前正在建设中。此链接是特高压范围内的世界上第一个高压直流输电项目 也是中国南方最重要的电力纽带之一。它将连接楚雄在 云南省到广东省遂东市的距离为1418公里。 该项目及其新技术为高压直流输电技术的发展迈出了重要的一步。 提供了更高水平的动力传输效率。 传输电压等级增加到800 kV,这意味着对传输电压的高要求。 设备设计。一方面,增加的介电应力将被覆盖 适当设计绝缘材料。内部和外部绝缘均应设计 彻底。另一方面,主要设备的尺寸增加导致 制造和运输到现场的挑战。本文作简要介绍 该项目,并总结了主要设备的设计方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号