A modern heuristic optimization method for AGC performance assessment at a power plant level

机译:用于电厂级别AGC性能评估的现代启发式优化方法

获取原文

摘要

In China Southern Power Grid, the well-developed Control Performance Standard (CPS) is employed to assess the AGC operation performance of the dispatch centers at the provincial level, and on this basis an economic penalty mechanism is established. Given this background, by adding a capacity coefficient to the CPS formulas, the CPS assessment method is extended to accommodate generation units, and a new approach for assessing the AGC operation performance of generation units developed. The penalty for each provincial dispatch center, in the form of electricity amount, is then allocated to the generation units based on the assessment outcomes, and as a result, this could provide an efficient incentive for those units to improve their AGC operation performance. The proposed approach is consistent with the existing CPS assessment framework, and its emphasis is placed on the long-term AGC operation performance of the generation units. In this way, the AGC dynamic operation indices, such as the regulation rates and regulation accuracy, are not required, and hence the method could be implemented easily in actual power systems.
机译:在南方电网,采用完善的控制绩效标准(CPS)对省级调度中心的AGC运行绩效进行评估,并在此基础上建立了经济惩罚机制。在这种背景下,通过将容量系数添加到CPS公式中,CPS评估方法扩展到可容纳发电机组,并且开发了一种用于评估发电机组AGC运行性能的新方法。然后,根据评估结果将每个省级调度中心的罚款以电量的形式分配给发电机组,因此,这可以为这些机组提供有效的激励,以改善其AGC的运行性能。所提出的方法与现有的CPS评估框架一致,其重点放在发电机组的长期AGC运营绩效上。以此方式,不需要诸如调节率和调节精度的AGC动态运行指标,因此该方法可以在实际电力系统中容易地实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号