Managerial System Change Mechanism in Construction Project of World Expo Shanghai 2010

机译:2010年上海世博会建设项目管理体制变革机制

获取原文

摘要

Project managerial system plays very important role in large scale complex projects like the construction project of World Expo Shanghai 2010 ( hereinafter called EXPO Shanghai). Though it is perfect for a managerial system to last as long as possible so that it can be well known for all parties, in fact, it is impossible for it to be kept unchangeable for a long period due to numerous uncertainty factors, condition changes, limited cognitive competence of personnel and organizations and etc. So it is absolutely necessary to study and execute the managerial system change mechanism in large scale complex project. In this paper, firstly, relevant literature review is performed ; Secondly, the managerial system of EXPO Shanghai is introduced and the main contents are changes of management conditions, organizational structure, relative net profit, contents of construction project and the new assisting managerial technology; Thirdly, a figure is provided to illustrate the managerial system change mechanism basing on the analysis of six key elements which is the management experience of EXPO. Some revelations are given at last.
机译:项目管理系统在大型复杂项目(例如2010年上海世博会的建设项目,以下简称EXPO上海)中起着非常重要的作用。尽管对于一个管理系统来说,尽可能长的持续时间是完美的,这样它对于所有各方来说都是众所周知的,但是实际上,由于众多不确定性因素,条件变化,有限的人员和组织等的认知能力。因此,在大型复杂项目中研究和执行管理系统变更机制是绝对必要的。本文首先对相关文献进行了综述。其次,介绍了上海世博会的管理体制,主要内容是管理条件,组织结构,相对净利润,建设项目内容和新的辅助管理技术的变化。第三,根据对世博会管理经验的六个关键要素的分析,提供了一个图来说明管理系统的变化机制。最后给出一些启示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号