HDD CONSTRUCTION RISKS AND CHALLENGES ON THE KING COUNTY BELLEVUE PUMP STATION FORCE MAIN PROJECT

机译:金县贝尔维尤水泵站主要项目的硬盘建设风险和挑战

获取原文

摘要

The King County Bellevue Pump Station Force Main project is a horizontal directional drilling project involving construction of a 5,300 lineal feet, 24-inch diameter (ID) sanitary sewer force main just south of downtown Bellevue, Washington. The two main segments of the force main were installed by HDD using 32-inch steel casing pipe and 28-inch HDPE carrier pipe. The first HDD segment is a 3,800 feet long, 200 feet deep crossing that involved: drilling under several residences, Bellevue High School, a condominium complex, and a courthouse building; settlement and vibration monitoring of numerous structures above and adjacent to the alignment; utilizing the "drill-and-intersect" method by employing two drill rigs at both sides of the crossing; and 7 tie-in welds of the steel casing pipe during the pullback due to limited pipe laydown area. The second HDD segment is a 1,000 feet long crossing under Interstate 405 that involved: installation of a 270 feet long steel conductor sleeve due to poor soils and a high groundwater table at the high end of the crossing; utilizing the "drill-and-intersect" method by employing two drill rigs at both sides of the crossing under a 10-lane highway; and setup of drilling operations adjacent to an active railroad bridge and major arterial. This paper discusses the construction risks and challenges faced by the contractor and project team, and the results and lessons learned during construction.
机译:金县贝尔维尤泵站部队主要项目是一个水平定向钻井项目,涉及在华盛顿州贝尔维尤市中心以南建造5300英尺,直径24英寸(ID)的卫生污水管网。 HDD使用32英寸的钢管套管和28英寸的HDPE输送管安装了力管的两个主要部分。 HDD的第一个部分是3,800英尺长,200英尺深的交叉口,涉及以下内容:在多个住宅,Bellevue高中,公寓大楼和法院大楼下进行钻探;路线上方和附近的众多建筑物的沉降和振动监测;通过在交叉口两侧使用两个钻机,利用“钻与相交”方法;由于回缩面积有限,钢套管的7个搭接焊缝。第二个硬盘驱动器段是跨405号州际公路的1,000英尺长的交叉口,涉及:由于土壤贫瘠和交叉口高端的地下水位高,安装了一个270英尺长的钢制导体套管;在一条10车道的高速公路下,在交叉口的两侧使用两个钻机,利用“钻与相交”的方法;并在活动的铁路桥梁和主要干线附近设置钻井作业。本文讨论了承包商和项目团队面临的施工风险和挑战,以及在施工过程中获得的结果和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号