Water Usage Optimization During Concrete Operations A Detailed Case Study Entailing Data from Bechtel Global Mining and Metals Projects

机译:在混凝土操作期间的水使用优化详细案例研究,从Bechtel Global Mining和Metals项目中提供数据

获取原文

摘要

Most of the currently ongoing Bechtel Mining & Metals (M&M) projects are being executed in arid or semi-arid countries; including Australia, Chile, Peru, and Argentina. Concrete operations at these sites entail a sizable scope of work-particularly at the early construction stages and require a significant volume of water. In compliance with the concrete admixture design requirements, water consumption during the mixing stages is carefully monitored. However, it was observed that no such controlled measures were in place for other peripheral water consumption needs associated with concrete operations including: aggregate washing, cleaning concrete trucks inside and out, dust suppression on truck routes, and during curing stages. In view of the limited availability of water resources in these countries, appropriate water conservation measures using a Six Sigma initiative were proactively pursued. This paper addresses the various measures employed by Bechtel to achieve the metrics defined here as part of water conservation. The Six Sigma initiative investigated areas driving water-optimization during our concrete operations beginning 2011 and intends to reduce the peripheral water usage by at least 30 per cent or approximately 250 L of water per cubic meter of concrete fabricated. Based on our company's projected global M&M project workload between 2012 and 2015, it is being forecast that approximately 16 million m of concrete will be produced on our projects. Our water optimization strategy aims at conserving approximately 4,000 million L of peripheral concrete process water resulting in a potential cost savings of roughly $8 million USD on these efforts alone.
机译:大多数目前正在进行的Bechtel采矿和金属(M&M)项目正在干旱或半干旱国家执行;包括澳大利亚,智利,秘鲁和阿根廷。这些网站的具体操作需要相当大的工作范围 - 特别是在早期建设阶段,并需要大量的水。根据具体的混合物设计要求,仔细监测混合阶段的耗水量。然而,据观察,没有这样的控制措施,可以用于与混凝土操作相关的其他外围消水需求,包括:骨料洗涤,清洁混凝土卡车内外,卡车路线上的灰尘抑制,以及固化阶段。鉴于这些国家的水资源可用性有限,主动追求使用六西格玛倡议的适当的水资源保护措施。本文涉及Bechtel采用的各种措施,以实现此处定义的指标作为水资源保护的一部分。在2011年开始,六西格玛倡议调查区域推动水优化,并打算将周边用水量降低至少30%或大约250升的混凝土。基于2012年和2015年我们公司预计的全球M&M项目工作负载,预计将在我们的项目中产生大约1600万米的混凝土。我们的水优化战略旨在节约大约4000万L的外围混凝土工艺水,从而潜在的成本节省了这些努力,这些努力仅为800万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号