首页> 外文会议>World environmental and water resources congress >An overview of large scale small hydropower in Yunnan Power Grid: situations, challenges and measures
【24h】

An overview of large scale small hydropower in Yunnan Power Grid: situations, challenges and measures

机译:云南电网大型小水电概述:情况,挑战与措施

获取原文

摘要

As one of the most important renewable resources, small hydropower is also an emphasized project of the Clean Development Mechanism (CDM), which has been greatly developed and of great importance to alleviate the energy crisis resulting from the rapid economic growth of China in the past few decades. The impact on power grid is more and more obvious as most small hydropower plants operate on a river run-off system and generation output variation is very large between wet period and dry period. In the meanwhile, the operation and management of small hydropower in China exist many outstanding problems due to the history and other reasons. Taking Yunnan power grid as the background, in this paper attempt has been made to explain the influence on safety and stability of power grid after large-scale small hydropower in operation. Firstly detailed describes the situation of small hydropower in Yunnan power grid. Secondly combined with the actual circumstances, analysis the problems and challenges that the power grid faces. Finally put forward the corresponding solution measures.
机译:作为最重要的可再生资源之一,小型水电也是清洁发展机制(CDM)的强调项目,这一直非常重要,非常重视缓解中国经济迅速增长导致的能源危机几十年。由于大多数小型水电站在河流耗尽系统上运行,因此在潮湿的时期和干燥时期之间产生的大多数小型水电站的影响越来越明显。同时,由于历史和其他原因,中国小水电的运作和管理存在许多出色的问题。以云南电网为背景,在本文中,已经尝试解释了在运行中大规模小型水电后电网安全和稳定性的影响。首先详细描述了云南电网小水电站的情况。其次结合实际情况,分析了电网面的问题和挑战。最后提出了相应的解决方案措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号