首页> 外文会议>World environmental and water resources congress >Initiation of Wastewater Collection and Treatment for Minneapolis and Saint Paul, 1926-1938
【24h】

Initiation of Wastewater Collection and Treatment for Minneapolis and Saint Paul, 1926-1938

机译:1926年至1938年,发起矿泉水收集和治疗,1926-1938

获取原文

摘要

In the modern world of today, it is easy to overlook significant accomplishments of the past century, some of which continue to provide benefits even to this day. One such accomplishment is the initiation of wastewater collection and treatment for Minneapolis and Saint Paul during the period 1926-1938. The problem addressed was the pollution of the Mississippi River. Extensive planning was followed by engineering design, construction, and operation of facilities that started the ever-evolving process of water pollution control. Evidence that this seminal work was of high quality is the fact that so much of this initial accomplishment remains fully functional and vital today. Evidence of the longevity of good planning, engineering, and construction is the remarkable record of subsequent inspection findings and low level of necessary maintenance and repair, particularly for the extensive collection system. Problems that have occurred provide lessons learned about the design details of the original project. The century since 1914, when the Minnesota Section, ASCE began, has seen the completion of many significant civil engineering projects. Perhaps none have been more so than the initiation of wastewater collection and treatment for Minneapolis and Saint Paul. This project is significant because of the gravity of the problem, the extensive nature of the planning, design, and construction, and the number of prominent civil engineers who were involved.
机译:在今天的现代世界中,很容易忽视过去一个世纪的重要成就,其中一些继续为这一天提供福利。一种这样的成就是在1926年至1938年期间启动污水采集和污水和圣保罗的治疗。解决的问题是密西西比河的污染。广泛的规划之后,工程设计,建筑和操作的工程设计,开始了不断发展的水污染过程。证据表明,这种精美的质量高的是,这一事实是,这么大的初始成就仍然是完全正常的,今天至关重要。良好规划,工程和建设寿命的证据是随后的检查结果和低必要的维护和维修水平的显着记录,特别是对于广泛的收集系统。发生的问题提供了关于原始项目的设计细节的经验教训。自1914年以来,当时明尼苏达州的艾斯塔斯开始,已经开始完成许多重要的土木工程项目。也许没有人比开始对明尼阿波利斯和圣保罗进行污水收集和治疗。该项目由于问题的重力,规划,设计和建设的广泛性质,以及所涉及的突出土木工程师的数量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号