首页> 外文会议>World environmental and water resources congress >The 2011 Mississippi River Flood and How the Mississippi River Tributaries Project System Provides 'Room for the River'
【24h】

The 2011 Mississippi River Flood and How the Mississippi River Tributaries Project System Provides 'Room for the River'

机译:2011年密西西比河洪水以及密西西比河和支流项目系统如何为河流提供“房间”

获取原文

摘要

The Mississippi River & Tributaries (MR&T) Project was authorized by Congress in the 1928 Flood Control Act following the disastrous 1927 flood and has thus far prevented a repeat of such catastrophic flooding while providing adequate conveyance to safely pass flood events. Despite the magnitude of the 2011 flood event, flooding was limited to the conveyance areas intended for safe passage of major floods as designed by the MR&T system. As with most major floods, public and media interest focused on the areas that were flooded, but provided only limited acknowledgement of the areas that would have flooded without the project. Despite the success of the MR&T Project, some interests have raised concerns that the flood risk reduction system has overly constricted or constrained the river and its floodplain and have suggested that more of the historic floodplain should be made available for major floods, habitat and water quality concerns. The Netherlands' "Room for the River" program consists of measures and projects designed to reopen its Rhine River floodplains to address similar concerns within their river basin. The MR&T project will be compared and contrasted to the Netherlands' program with an emphasis on the differences in scale between the two programs, with respect to the overall area and volume of water that must be conveyed by the systems. Using the 2011 Flood results, this paper compares how the MR&T project system was designed and how it functioned to provide "Room for the River" while limiting flooding impacts to the four million residents of the Lower Mississippi River basin.
机译:密西西比河和支流(MR&T)项目由国会授权于1928年灾害1927年洪水洪水洪水洪水,并避免了重复这种灾难性的洪水,同时提供了充分的运输,以安全地通过洪水事件。尽管2011年洪水事件的严重程度,洪水仅限于旨在通过MR&T系统设计的主要洪水的安全区域。与大多数主要的洪水一样,公众和媒体兴趣的专注于被洪水淹没的地区,但只有有限的承认在没有项目的情况下会被淹没。尽管先生项目的成功,一些利益令人担忧的是,洪水风险减少制度过于收缩或限制河流及其洪泛区,并建议更多历史洪泛区用于主要洪水,栖息地和水质。担心。荷兰的“河流空间”计划包括旨在重新打开其莱茵河洪泛区的措施和项目,以解决其河流流域内的类似问题。将与荷兰的计划进行比较和对比,并强调两个方案之间的规模差异,关于必须由系统传达的水资源的整体面积和水量之间的规模。本文使用2011年洪水结果进行了比较MR&T项目系统的设计方式以及它如何运作,为河流提供“河流”,同时限制了洪水对较低的密西西比河流域的400万居民的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号