首页> 外文会议>International Universities Power Engineering Conference;UPEC 2008 >Measurement placement algorithms for state estimation when the number of phasor measurements by each PMU is limited
【24h】

Measurement placement algorithms for state estimation when the number of phasor measurements by each PMU is limited

机译:当每个PMU的相量测量数量受到限制时,用于状态估计的测量放置算法

获取原文

摘要

It is essential for Energy Management Systems (EMS) applications and control centre technologies that the measurements allow monitoring of the power system. An important tool for the EMS is state estimation which makes it possible to estimate the state variables of the power system based on these measurements. The measurements should allow observability of the power system which means they can be used to describe the system. The objective of the paper is to develop an algorithm for placement of PMUs in order to make the system observable. The novelty is that a limit on the number of measurements each PMU can make is introduced. The number of PMUs needed to make the network observable will therefore depend on the maximum number of measurements each PMU can make. The algorithm is tested on three IEEE test networks.
机译:测量值允许监视电源系统,对于能源管理系统(EMS)应用程序和控制中心技术至关重要。用于EMS的重要工具是状态估计,该状态估计使基于这些测量值估计电力系统的状态变量成为可能。测量值应允许对电源系统进行观察,这意味着可以使用它们来描述系统。本文的目的是开发一种用于放置PMU的算法,以使系统可观察。新颖之处在于引入了每个PMU可以进行的测量次数的限制。因此,使网络可观察所需的PMU数量将取决于每个PMU可以进行的最大测量数量。该算法在三个IEEE测试网络上进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号