首页> 外文会议>Innovation, practice, safety >SEISMIC SLOPE STEBILITY ANALYSIS OF JOINTED ROCK MASSES ON THE NORTHERN ABUTMENT OF GOTVAND DAM, IRAN
【24h】

SEISMIC SLOPE STEBILITY ANALYSIS OF JOINTED ROCK MASSES ON THE NORTHERN ABUTMENT OF GOTVAND DAM, IRAN

机译:伊朗GOTVAND DAM北AB缝节理岩体的地震边坡稳定性分析

获取原文

摘要

Gotvand Dam is one of the largest rockfill dams in Iran that is now under construction that the height is 178m.There is a dislocated rock mass formed of conglomerate in the right abutment of the dam which has several sets of joints and it seems to have a considerable potential of instability. A discontinuum modeling approach is to be more appropriate to analyze the problem of a rock slope with multiple joint sets which could control the mechanism of failure. In this study, the distinct element UDEC code has been used to analyze the stability of the rock mass subjected to dynamic earthquake loading. It is expected that the slope will be stable after earthquake shaking,despite of considerable sliding movements of rock layers which may take place during strong ground motion.
机译:Gotvand大坝是伊朗目前最大的堆石坝之一,目前正在建设中,高度为178m。在大坝的右岸有一块由砾岩形成的错位岩体,它有几套节理,似乎有一个潜在的不稳定性。一种不连续的建模方法更适合于分析具有多个节理的岩石边坡问题,这些节理可以控制破坏机理。在这项研究中,使用独特元素UDEC代码来分析动态地震荷载作用下岩体的稳定性。尽管在强烈的地面运动中可能发生岩石层的相当大的滑动运动,但预计在地震震动后该斜坡将保持稳定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号