首页> 外文会议>Waste Management Symposium >Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?
【24h】

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?

机译:能源废物处理设施部门的技术就绪评估:什么时候可以插入技术?

获取原文

摘要

This paper will describe a technology readiness assessment process (TRA) that the U.S. Department of Energy (DOE) piloted at Hanford's Waste Treatment and Immobilization Plant (WTP) and has subsequently applied to other projects at Hanford and the Savannah River Site. The methodology used for these TRAs was based upon detailed guidance contained in the U.S. Department of Defense (DoD), Technology Readiness Assessment Deskbook [1] and adapted a technology readiness scale developed by the DOD and National Aeronautics and Space Administration (NASA) to the DOE. This paper will discuss the application of the TRA process to the WTP and the development of a Technology Maturation Plan (TMP) based on the TRA findings.
机译:本文将介绍技术准备评估流程(TRA),美国能源部(DOE)在汉福德的废物处理和固定化工厂(WTP)进行了试点,随后将其应用于汉福德和萨凡纳河站点的其他项目。用于这些TRA的方法是基于美国国防部(DoD)《技术就绪评估手册》 [1]中包含的详细指南,并采用了由DOD和美国国家航空航天局(NASA)制定的技术就绪量表。美国能源部。本文将讨论TRA流程在WTP中的应用以及基于TRA发现的技术成熟度计划(TMP)的开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号