POWER ALERT: AN INNOVATIVE SYSTEM TO CONTROL RESIDENTIAL LOADS UNDER PEAK CONDITIONS USING NATIONAL TV

机译:电源警报:使用国家电视在峰值条件下控制住宅负载的创新系统

获取原文

摘要

The Western Cape Region of South Africa experienced severe power supply problems between February 2006 and August 2006. The reason for this was that Eskom who it the electricity supply utility, lost one of its Nuclear Supply Units. Forecasts predicted a winter shortfall of 300 MW for the region out of an average supply of about 4000 MW. It was clear that if something could not be done to reduce the demand, power outages would be experienced. The main concern was the evening peak between 18:00 and 21:00 due to the high evening load. Eskom sent out a request for proposals to energy solution providers and ESCOs to come up with solutions to solve the crisis. The problem was that there was not enough time to implement solutions like residential hot water control systems in the 625 000 households of the Western Cape. The total residential load was around 1 200 MW. Energy Cybernetics, an energy solution provider, came up with the solution to use the National TV Broadcaster to inform the public on the status of the electricity supply network between 18:00 and 21:00 on weekdays. Energy Cybernetics and Yardstick implemented the project for Eskom. It was called Power Alert. Power Alert made use of real-time total electrical load data obtained from Eskom's National Control Centre to identify when the electrical supply was under strain. Predictive modelling was also used to determine the total electrical demand for the Western Cape based on realtime data, historical data and predicted weather conditions. The real-time predictive modelling was then used to predict the demand of the Western Cape 30 minutes, 60 minutes and 24 hours in advance. An online computer system and application was also developed that connected the Power Alert Control Centre to the Broadcasters Control Centre. This provided the Power Alert Control Centre with the capability to change any message to be broadcasted within five minutes. The real time predictive modelling was used to predict the total electrical demand and consequently the expected level of strain.
机译:南非的西开普省在2006年2月至2006年8月之间遇到了严重的电力供应问题。其原因是电力供应公司Eskom失去了一个核供应单位。预测预测该地区冬季短缺300兆瓦,而平均供应量约为4000兆瓦。显然,如果无法采取措施减少需求,将会发生停电的情况。由于晚上的高负荷,主要关注的是18:00至21:00之间的傍晚高峰。 Eskom向能源解决方案提供商和ESCO发送了征求建议书,以提出解决危机的解决方案。问题是在西开普省的625 000户家庭中没有足够的时间来实施诸如住宅热水控制系统之类的解决方案。住宅总负荷约为1200兆瓦。能源解决方案提供商Energy Cyber​​netics提出了使用国家电视广播公司的解决方案,以在工作日的18:00至21:00之间向公众通报供电网络的状态。能源控制论和Yardstick为Eskom实施了该项目。它被称为电源警报。 Power Alert利用从Eskom国家控制中心获得的实时总电力负载数据来确定电力供应何时处于紧张状态。预测模型还用于根据实时数据,历史数据和预测的天气状况确定西开普省的总电力需求。然后使用实时预测模型提前30分钟,60分钟和24小时预测西开普省的需求。还开发了一个在线计算机系统和应用程序,它将电源警报控制中心连接到广播电台控制中心。这使Power Alert Control Center能够更改五分钟之内要广播的任何消息。实时预测模型用于预测总的电力需求,从而预测应变的预期水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号