ROUGH RIVER DAM SAFETY ASSURANCE PROJECT

机译:江河大坝安全保障项目

获取原文

摘要

As a result of the U. S. Army Corps of Engineers' routine monitoring and inspection program, some dam safety problems were noted with the downstream slope, stilling basin, and spillway of Rough River Dam, Kentucky. Modifications to the dam are necessary to reduce the risk of structural compromise due to original design and construction deficiencies as well as changes in the state-of-the-practice design criteria. While no emergency conditions have developed, the repairs are necessary to modernize the existing dam as well as maintain the long-term integrity and safety of the dam. The Louisville District completed a study to evaluate each dam safety problem and recommend repairs. Substantial pre-design efforts and close communication with local officials and the public helped to maintain the emphasis on public safety while minimizing public inconvenience. The repair project provided innovative and economical solutions to "buy down" risks to the public, property, and the environment and to ensure that the dam is operated and maintained as safely and effectively as is reasonably possible.
机译:由于美国陆军工程兵团的例行监测和检查计划,发现肯塔基州Rough River大坝的下游坡度,静水盆地和溢洪道存在一些大坝安全问题。对水坝进行修改是必要的,以减少由于原始设计和施工缺陷以及实际设计标准的变更而导致结构受损的风险。尽管没有发生紧急情况,但必须进行维修以使现有大坝现代化并保持大坝的长期完整性和安全性。路易斯维尔区完成了一项研究,以评估每个大坝的安全问题并提出维修建议。在进行大量的设计前工作以及与地方官员和公众的密切沟通有助于保持对公共安全的重视,同时最大程度地减少了对公众的不便。维修项目提供了创新,经济的解决方案,以“降低”对公众,财产和环境的风险,并确保合理合理地运营和维护大坝。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号