首页> 外文会议>International Offshore and Polar Engineering Conference >Ormen Lange Offshore Project Subsea Development Strategy and Execution
【24h】

Ormen Lange Offshore Project Subsea Development Strategy and Execution

机译:Ormen Lange离岸项目海底开发策略和执行

获取原文

摘要

During recent years the Ormen Lange Offshore Project has been developed in a setting where environmental conditions, technical solutions and execution strategy to a significant extent have been challenged. The environmental conditions are characterized by heavy winter storms with swell, strong current, deep water temperatures below zero, irregular sloping seabed terrain and considerable variations in seabed conditions. The technical solutions have been governed by a subsea development concept tied back to shore over a considerable distance and with a large production capacity. The execution strategy has been heavily influenced by a risk approach both on contract strategy, method and equipment selection, general robustness and follow-up during construction. The success of the Ormen Lange Offshore Project has been highly dependant on a strong project management to accommodate and account for these issues.
机译:近年来,Ormen Lange海上项目的开发环境对环境条件,技术解决方案和执行策略都提出了很大的挑战。环境条件的特​​点是,冬季暴风骤雨,浪涌,强流,深水温度低于零,不规则的倾斜海底地形以及海底条件的显着变化。这些技术解决方案受到海底开发概念的支配,该概念在相当长的距离内并具有很大的生产能力,并与岸相连。合同策略,方法和设备选择,总体稳健性和施工过程中的后续措施均受风险方法的影响,因此执行策略受到了很大的影响。 Ormen Lange海上项目的成功高度依赖于强大的项目管理人员来解决和解决这些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号