首页> 外文会议>International Conference on Port and Ocean Engineering Under Arctic Conditions;POAC'07 >CONSTRUCTION ASPECTS OF BUILDING AN EVACUATION ROUTE THROUGH RUBBLE SURROUNDING BEAUFORT SEA STRUCTURES
【24h】

CONSTRUCTION ASPECTS OF BUILDING AN EVACUATION ROUTE THROUGH RUBBLE SURROUNDING BEAUFORT SEA STRUCTURES

机译:通过粗糙的围墙-海堤结构搭建撤离路线的施工方式

获取原文

摘要

For EER plans involving on-ice evacuation methods in the winter, an emergency shelter located on the adjacent ice is an important safety element for personnel working in oil or gas facilities in the Beaufort Sea. The ice surrounding a structure can vary from thin level first year ice to grounded rubble or ridges. The speed and safety of walking over the ice surface is strongly affected by the surface roughness and degree of ice rubble. Thus, a groomed trail from an oil or gas structure to an emergency shelter should be constructed that is suitable for walking. This paper discusses the methods, equipment required, construction duration and associated risks to efficiently construct and maintain the trail. The emphasis is on practical methods that can work in the wide range of ice and weather conditions that can occur in the Beaufort Sea region during the winter and spring.
机译:对于在冬季采用冰上疏散方法的EER计划,位于波弗特海的石油或天然气设施中的工作人员位于相邻的冰层上,这是一个重要的安全元素。围绕结构的冰块可能从第一年的薄层冰块到地面的碎石或山脊不等。在冰面上行走的速度和安全性受到冰面的粗糙度和程度的强烈影响。因此,应修建一条从石油或天然气结构到紧急庇护所的整洁的小径,以适合步行。本文讨论了有效建造和维护步道的方法,所需设备,工期和相关风险。重点是可以在冬季和春季在波弗特海地区发生的各种冰雪天气条件下工作的实用方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号