FOUNDATION GROUTING AT RUETER-HESS DAM EVOLUTION FROM DESIGN TO CONSTRUCTION

机译:从设计到施工在瑞特坝大发展中的基础灌浆

获取原文

摘要

Predicting the extent of foundation grouting required for a dam generally creates significant turmoil for the design engineer and may present a large degree of financial uncertainty for the Owner. Grout takes are highly sensitive to the properties of the geologic units present and are often impacted by local variations in the formation. This paper will present the evolution of the grouting program for Rueter-Hess Dam from design through production grouting. Foundation grouting was generally performed in four phases: initial geotechnical field investigation, design, field test sections, and production grouting.
机译:预测大坝所需的基础灌浆程度通常会给设计工程师造成极大的动荡,并可能给业主带来很大的财务不确定性。灌浆对所存在的地质单元的特性高度敏感,并且经常受到地层局部变化的影响。本文将介绍Rueter-Hess大坝注浆程序从设计到生产注浆的演变。基础灌浆通常分为四个阶段:初始岩土现场调查,设计,现场测试部分和生产灌浆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号