首页> 外文会议>58th International Astronautical Congress 2007 >Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle
【24h】

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

机译:NASA Ares I乘员运载火箭的集成系统测试方法

获取原文

摘要

The Ares I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew access to the International Space Station (ISS) and, together with the Ares V Cargo Launch Vehicle (CaLV), serves as one component of a future launch capability for human exploration of the Moon. During the system requirements definition process and early design cycles, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements: the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine, will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle ground vibration test (IVGVT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, and a high-altitude demonstration of the launch abort system (LAS) following separation. The Orion-1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.
机译:美国国家航空航天局(NASA)正在开发Ares I乘员运载火箭(CLV),以为机组人员提供进入国际空间站(ISS)的通道,并与Ares V运载火箭(CaLV)一起提供服务作为人类对月球探索的未来发射能力的组成部分。在系统需求定义过程和早期设计周期中,NASA定义并开始实施集成的地面和飞行测试计划,这些计划是实现首次人工发射Ares I所必需的。单个Ares I飞行硬件元素:第一阶段五段助推器(FSB) ),上级发动机和J-2X上级发动机,将在飞行前进行广泛的开发,鉴定和认证测试。关键的集成系统测试包括主推进测试文章(MPTA),集成的上级和上级发动机总成的验收测试,全面的集成车辆地面振动测试(IVGVT),表征车辆性能的空气动力学测试以及集成测试航空电子和软件组件。 Ares I-X开发飞行测试将提供飞行数据,以验证空气动力学性能,阶段分离,结构动态性能和控制系统功能的工程模型。 Ares I-Y飞行测试将验证第一阶段的上升性能,阶段分离功能以及分离后的发射中止系统(LAS)的高空演示。 Orion-1飞行测试将在首次进行人员升空之前,在整个上升飞行过程中作为完整的,不偏航的,可操作的飞行测试进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号