Factors Affecting Subcontracting Strategies in Industrial Mega Projects

机译:影响工业巨型项目分包策略的因素

获取原文

摘要

Many projects, particularly in the energy sector, suffer from problems and ambiguities that exist in the buyout phase of projects and result in massive time and cost overruns. Establishing an appropriate subcontracting strategy in an industrial project is a multifaceted practice in which many factors are involved, yet the associated issues are seldom acknowledged. This study first investigates the relevant problems, and then identifies and analyzes the important factors influencing subcontracting strategies from a general contractor’s point of view. The analysis is based on two questionnaire surveys and interviews administered to 40 practitioners who were involved in seven Lump-Sum-Turn-Key projects in companies operating as general contractors in execution of large-scale hydro power plants. Twenty-seven problems associated with, and 32 factors affecting subcontracting practices have been identified, analyzed and rank-ordered based on their relative importance parameters. The study also provides guidelines and recommendations regarding actions that need to be taken by general contractors to effectively develop an appropriate subcontracting strategy, enhance existing practices, and accordingly curtail the relevant time and cost overruns.
机译:许多项目,特别是在能源部门,遭受了项目的买断阶段存在的问题和歧义,并导致大规模的时间和成本超支。在工业项目中建立适当的分包策略是一种多方面的实践,其中涉及许多因素,但相关问题很少承认。本研究首先调查了相关问题,然后识别并分析了影响总承包商的观点的分包战略的重要因素。分析基于两个调查问卷调查和访谈,管理到40名从业者,他们参与在执行大规模水电站的总承包商的公司中涉及七个集合转向关键项目。已经确定,基于其相对重要的参数分析和排序,确定了与影响分包实践的三十七个问题和32个因素。该研究还提供了有关一般承包商需要采取的行动的准则和建议,以有效制定适当的分包策略,加强现有实践,并因此限制相关的时间和成本超支。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号