Work on the implementation of Material Protection,Control and Accounting(MPC&A) Operations Monitoring(MOM)systems at Federal Atomic Energy Agency(Rosatom)facilities is being conducted within the framework of the Agreement between the United States and the Russian Federation on the MPC&A Program.The beginning of work on the MOM project was officially announced in 2004 in the course of a letter exchange between the Minister for Atomic Energy of the Russian Federation and the Secretary of the United States Department of Energy. However,actual work on the project did not occur until the end of the 2005.This resulted in very strict time constraints for project implementation.Consequently,work started on five various activities simultaneously:development of the concept document;installation of the MOM pilot system;development of a protection profile for software certification;development of MOM system design and procedures confirming the target use of equipment;and also compliance with OIT(hardware certification)requirements.This paper discusses these five aspects of work performed for the implementation of MOM systems at Rosatom facilities.
机译:在美国和俄罗斯联邦关于MPC&A计划的协议框架内,正在联邦原子能机构(Rosatom)设施中实施实施材料保护,控制和核算(MPC&A)操作监控(MOM)系统的工作。 MOM项目的开始工作于2004年在俄罗斯联邦原子能部长与美国能源部部长之间的换文过程中正式宣布。但是,直到2005年底,该项目才真正开始工作。这导致了严格的项目实施时间限制。因此,同时开展了五项活动:概念文件的开发; MOM试点系统的安装;开发用于软件认证的保护配置文件;开发用于确认设备目标使用的MOM系统设计和程序;以及符合OIT(硬件认证)要求。本文讨论了为实施MOM系统而执行的这五个方面的工作。在Rosatom设施中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号