首页> 外文会议>International conference on ground control in mining >Longwall Mining in Illinois: A Controversy over Planned Subsidence of Flat Farmland
【24h】

Longwall Mining in Illinois: A Controversy over Planned Subsidence of Flat Farmland

机译:伊利诺伊州的长壁开采:关于平坦农田的计划沉降的争议

获取原文

摘要

Underground coal mining in Illinois has a lengthy history dating back to the early 1800's. High extraction underground mining has played a significant role in production through out this time. Modern mechanized longwall mining methods were introduced in the 1960's and have been in continual use ever since. Regulations governing subsidence from underground coal extraction and the mitigation of resulting impacts to surface structures and surface land initiated in 1983.Despite the history of experience with subsidence, recent plans to longwall in Illinois have stirred public emotions and strong opposition. Anti and pro longwall groups formed and divided a community over the potential economic benefits new mining ventures could bring verses the potential problems associated with longwall mining in productive flat farmland. The debate culminated in a county wide referendum vote on the use of longwall mining. This paper provides an overview of the history of underground mining in Illinois, the controversy that has risen in central Illinois regarding longwall mining, and the efforts to educate the public about regulations that govern longwall subsidence.
机译:伊利诺伊州的地下煤矿开采历史可追溯到1800年代初期。在整个这段时间里,高提取地下采矿在生产中一直发挥着重要作用。 1960年代开始采用现代机械化的长壁开采方法,此后一直在持续使用。 1983年制定的管理地下煤炭开采沉陷以及减轻对地表结构和地表的影响的法规。 尽管有过沉陷经验,但最近在伊利诺伊州修建长城的计划激起了公众的情绪和强烈的反对。反长壁部落和亲长壁团体在潜在的经济利益上形成了一个社区,并将社区划分开来。新的采矿业可能带来与生产平坦农田中的长壁采矿有关的潜在问题。辩论最终在全县举行了关于使用长壁开采的全民投票。本文概述了伊利诺伊州地下采矿的历史,伊利诺伊州中部有关长壁开采的争议以及对公众进行长壁沉降管理的教育。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号