STUDY OF ISLANDING TEST METHOD USING MULTIPLE INTERCONNECTED PHOTOVOLTAIC INVERTERS: EXAMINATION BY DIFFERENCE IN MOTOR LOAD INSTALLATION CONDITIONS

机译:多个相互连接的光伏逆变器的孤岛测试方法的研究:在电机负载安装条件下的差异检验

获取原文

摘要

There are high expectations for photovoltaic (PV) power generation systems as a means of curbing the carbon dioxide (CO_2) emissions that cause global wanning. Recently there has been rapid growth in the use of PV power generation systems installed locally (i.e. concentrated interconnection) to a specific power distribution system, and therefore there are issues regarding the safety of such systems and the quality of the electric power generated, such as rises in system voltage, increases in higher harmonics, and the emergence of the phenomenon of islanding operation.This may be attributed to the launch by the New Energy and Industrial Technology Development Organization (NEDO) of verification research for concentrated interconnection PV power generation systems as a five-year program beginning in fiscal 2002 to aid the smooth and reliable growth of residential PV power generation systems in concentrated interconnection. The research and development concerned has included engineering development to meet the technical requirements for performing concentrated interconnection, such as the construction of systems allowing the effective utilization electric power generated by PV power generation systems. However, since no method of evaluating devices for detecting islanding operation during concentrated interconnection of PV power generation systems exists, there is an urgent need to establish a method of testing multiple interconnected photovoltaic inverters, and this has resulted in the launch of a two-year program of basic experiments and study of test methods beginning in fiscal 2006.In this report, we identify issues that need to be resolved when developing the testing method, and perform studies under different motor load installation conditions, one of the issues to be examined.
机译:人们对光伏(PV)发电系统寄予厚望,以将其作为抑制导致全球变暖的二氧化碳(CO_2)排放的手段。最近,在本地安装(即集中互连)到特定配电系统的PV发电系统的使用迅速增长,因此,存在关于此类系统的安全性和所产生的电能质量的问题,例如系统电压上升,高次谐波增加以及出现孤岛运行现象。 这可能是由于新能源和工业技术开发组织(NEDO)发起了一项针对集中互联光伏发电系统的验证研究,该研究是从2002财年开始的为期五年的计划,旨在帮助住宅光伏发电的平稳可靠发展集中互连的发电系统。相关的研究和开发包括满足满足集中互连技术要求的工程开发,例如可有效利用PV发电系统产生的电力的系统的构建。然而,由于不存在评估用于在光伏发电系统的集中互连期间检测孤岛运行的装置的方法,因此迫切需要建立一种测试多个互连的光伏逆变器的方法,并且这导致了两年的启动。从2006财年开始的基础实验计划和测试方法研究。 在本报告中,我们确定了开发测试方法时需要解决的问题,并在不同的电机负载安装条件下进行了研究,这是要研究的问题之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号