首页> 外文会议>International Symposium on Heating, Ventilating and Air Conditioning >Strategies for optimal operation of HVAC systems of a large laboratory buildingbased on ten years on-going Cx
【24h】

Strategies for optimal operation of HVAC systems of a large laboratory buildingbased on ten years on-going Cx

机译:基于持续10年的Cx的大型实验室建筑HVAC系统最佳运行的策略

获取原文

摘要

Tokyo Electric Power Company R&D Center wascompleted in September 1994. The buildingsconstructed in Phase I (hereinafter just called “thebuildings") were conferred the 35th Annual Awardsby the Society of Heating, Air-Conditioning, andSanitary Engineers of Japan (SHASE). The awardwas given to commend the 30% (approx.) energysavings attained by the adoption of the cold airdistribution system and various other techniques andtechnologies for energy conservation and operationmanagement. Tokyo Electric Power Company R&DCenter has undertaken a wide range of buildingcommissioning including building management sincethe completion of the construction. Now that adecade has passed since the completion, the R&DCenter has enhanced the energy-saving performancewell beyond the levels previously awarded.
机译:东京电力公司研发中心原为 1994年9月竣工。建筑物 一期工程(以下简称“ 建筑物”)被授予第35届年度大奖 由加热,空调学会和 日本卫生工程师(SHASE)。奖项 被给予表彰30%(大约)的能量 采用冷空气节省的成本 分配系统和其他各种技术,以及 节能与运行技术 管理。东京电力公司研发 中心进行了广泛的建设 从此开始调试,包括建筑物管理 建设完成。现在,一个 自完成以来已经过去了十年,研发 中心提高了节能效果 远远超出了先前授予的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号