DEA CONVERSION TO MDEA BASED SOLVENT RESULTS INENERGY SAVINGS AND INCREASED TREATING CAPACITY ATTHE ENERGY TRANSFER - LA GRANGE GAS PLANT

机译:将DEA转换为基于MDEA的溶剂结果,从而节省能源,并提高能量转移时的处理能力-LA天然气厂

获取原文

摘要

The Energy Transfer La Grange Gas Plant was commissioned in 1982 to produceover 24,000 barrels per day of natural gas liquids (NGL) from 230 MMscfd of naturalgas. With wellhead volumes below historical, in 2003 one of the residue turbinecompressors was converted to inlet boost service, thus reducing the inlet gas capacity tothe current 200 MMscfd. The plant operated for many years using 30 weight %diethanolamine (DEA) to treat the NGL product. In April 2004, a pipe rupture andresulting fire led to the subsequent replacement of some major plant equipment. As theLa Grange plant is one of the main processing assets of the company, it was critical thatthis facility be brought back into operations as quickly as possible. In parallel with initialreconstruction activities, the GAS/SPEC Technology Group of INEOS assisted EnergyTransfer with evaluating the installation of a refurbished amine unit and the replacementof the amine solvent with GAS/SPEC? CS-1 (1). Through the combined efforts of thetwo companies, the new amine unit was put back into operations in July 2004, threemonths after the plant outage. This paper details the design decisions and the timelinefollowed to restart the unit. In addition, the paper will discuss some of the benefitsreaped as a result of equipment and solvent changes.
机译:能源转移La Grange天然气厂于1982年投入生产 每天从230 MMscfd的天然气中提取超过24,000桶的天然气液(NGL) 气体。井口容积低于历史水平,2003年是渣油轮机之一 压缩机被转换为进气增强服务,从而将进气容量降低至 当前的200 MMscfd。该工厂使用30%的重量百分比运行了多年 二乙醇胺(DEA)处理NGL产品。 2004年4月,管道破裂, 发生的火灾导致随后更换了一些主要的工厂设备。作为 La Grange工厂是公司的主要加工资产之一,至关重要的是 该设施将尽快恢复运营。与初始并行 重建活动,INEOS的GAS / SPEC技术小组辅助能源 通过评估安装翻新的胺装置和更换来进行转移 胺溶剂与GAS / SPEC混合使用? CS-1(1)。经过各方面的共同努力 两个公司,新的胺装置于2004年7月重新投入运营,其中三个 工厂停运后的几个月。本文详细介绍了设计决策和时间表 然后重启设备。此外,本文还将讨论一些好处 由于设备和溶剂的变化而收割。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号