Preliminary Feasibility Economics and Risks of CO2 Geosequestration in Coal Seams of the Bowen Basin, Australia

机译:澳大利亚博文盆地煤层的初步可行性经济分析和CO2探鹅的风险

获取原文

摘要

Preliminary costs and feasibility economics are presented for a 9.5 mt/yr CO2 capture, transportation and storage project in the Permian coals of the Bowen Basin, Australia. Total capital costs for a 44yr life project are estimated at A$2.8 billion, allowing for a 250 km pipeline, conversion of 500 wells to injection, and field distribution and separation. Operating costs have been estimated on a life-cycle basis at A$35/t of CO2 stored. The total life-cycle cost of the project (undiscounted and excluding cost of capital) is estimated at A$42/t CO2 stored and A$57/t CO2 avoided. The CO2 stored would amount to 380 mt. After revenue credits for the enhanced coalbed methane (ECBM), the net cost is reduced by 46%, to A$22/t CO2 stored and A$30/t CO2 avoided. This net cost can be reduced to zero with a gas price of A$5/GJ. Alternatively, the same zero cost can be achieved with a CO2 credit of A$30/t avoided. The potential CO2 leakage, at a maximum of 0.033%, is considered negligible due to the inherently-mitigating design of the ECBM process and site.
机译:介绍了澳大利亚Bowen盆地二叠纪煤中9.5吨/年的CO2捕集,运输和封存项目的初步成本和可行性经济学。一个为期44年的人寿项目的总资本成本估计为28亿澳元,包括一条250公里的管道,将500口井转换为注入井以及现场分配和分离。生命周期内的运营成本估计为每吨存储的二氧化碳35澳元。该项目的整个生命周期成本(未计入资本成本,未计折现)估计为42澳元/吨二氧化碳存储量和避免57澳元/吨二氧化碳排放量。储存的二氧化碳将达到380公吨。扣除增值煤层气(ECBM)的收入抵免后,净成本降低了46%,降至22澳元/吨二氧化碳存储量,避免了30澳元/吨二氧化碳排放量。天然气价格为5澳元/ GJ时,该净成本可以降低为零。或者,可以避免二氧化碳排放额度为30澳元/吨的情况,实现相同的零成本。由于ECBM工艺和现场的固有缓解设计,潜在的最大20.03%的CO2泄漏可以忽略不计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号