首页> 外文会议>International Conference on Greenhouse Gas Control Technologies >Initial Evaluation of Carbon Capture Plant Flexibility
【24h】

Initial Evaluation of Carbon Capture Plant Flexibility

机译:碳捕集工厂灵活性的初步评估

获取原文

摘要

Fossil fuel generating capacity is currently run at variable load in many power systems to achieve instantaneous demand/supply matching and provide reserve capacity. This paper discusses changes to the flexibility of fossil-fired power stations as a result of adding carbon capture and suggests that these changes could be analysed effectively using a grid simulation technique to identify changes to the cost of secure and reliable electricity generation. The modelling presented here focuses on describing and analysing various modes of operation for post-combustion capture plants. Other capture technologies may also alter plant flexibility and some specific examples are highlighted.
机译:当前,在许多电力系统中,化石燃料发电能力以可变负载运行,以实现瞬时需求/供应匹配并提供备用容量。本文讨论了由于增加了碳捕获而导致的化石燃料发电站灵活性的变化,并建议可以使用网格模拟技术对这些变化进行有效分析,以确定安全可靠的发电成本的变化。本文介绍的建模重点在于描述和分析燃烧后捕集电厂的各种运行模式。其他捕获技术也可能会改变工厂的灵活性,并着重介绍一些特定示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号