Deep Gas-Well Cementation: A Review of Risks and Design Basis for Use of a LiquidCement Premix for Large Offshore Cementing Operations

机译:深层气井固井:使用液态水泥预拌料进行大型海上固井作业的风险和设计基础的回顾

获取原文

摘要

Large volume offshore cement jobs can present a number ofchallenges. Larger casing strings set to deeper depths havedriven up the volume of cement jobs beyond the capacity ofmany rigs. A recent well design called for two cement jobsthat would exceed 2,400 bbl. There were a number of optionsconsidered for dealing with these large cement jobs. Theseincluded spotting lift boats beside the rig, the use of adedicated cementing vessel, the deployment of ocean goingbarges, spotting an additional jack up rig, or the use of a liquidcement premix.This paper discusses the risk analysis anddevelopment plan that led to the selection of a liquid cementpremix for the large volume jobs. The paper covers the designrequirements of the jobs and addresses the risks associatedwith the available options. Information is provided on risksassociated with boat and barge stability, draft limits atavailable bulk facilities, deck load limits and logistics ofalternative designs. Rig based pumping operations areincluded with respect to logistics and timing issues related toplacing the entire operation on the rig.These jobs were to be the largest liquid cementpremix jobs to date. Slurry stability and consistency weremajor concerns on these jobs. These were addressed throughfull scale testing on the vessel. (The results of which aresummarized in SPE 98894 1.) The paper further covers theequipment requirements and mixing needs and compares theselected option to that of a conventional cement job.
机译:大量的海上水泥作业可能带来许多 挑战。较大的套管柱设置为更深的深度 推动了水泥工作量的增长,超出了 许多钻机。最近的一口井设计要求两个水泥作业 那将超过2,400桶。有很多选择 考虑处理这些大型水泥工作。这些 包括在钻机旁发现起重船, 专用固井船,远洋部署 驳船,发现额外的自升式钻机或使用液体 水泥预拌料。 本文讨论了风险分析和 导致选择液态水泥的发展计划 用于大量工作的预混料。本文涵盖设计 工作要求并解决相关风险 与可用的选项。提供有关风险的信息 与船和驳船的稳定性有关,吃水极限为 可用的散装设备,甲板载重量限制和后勤 替代设计。基于钻机的抽油作业是 包括与以下方面有关的后勤和时间安排问题: 将整个操作放在钻机上。 这些工作将是最大的液态水泥 迄今为止的预混作业。泥浆的稳定性和稠度分别为 这些工作的主要问题。这些是通过以下方式解决的 在容器上进行全面测试。 (其结果是 在SPE 98894中进行了总结1.)本文进一步介绍了 设备要求和混合需求,并比较 常规水泥工作的最佳选择。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号