DEEP FOUNDATIONS IN KARST - LESSONS LEARNED FROM 1-40 CORRIDOR WIDENING IN KNOXVILLE, TENNESSEE

机译:田纳西州诺克斯维尔的1至40个走廊宽阔的岩溶中的深层基础

获取原文

摘要

Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to widen and improve segments of 1-40 and associated interchanges in Knoxville, Tennessee. The projects are within the karst terrain of the Valley and Ridge Province. Subsurface conditions are characterized by an irregular rock surface coupled with differential weathering.Because of the projects' impact to local and interstate motorists, consideration was given to innovative planning, materials and construction practices that could accelerate construction. Two innovative deep foundation measures included rock-socketed pipe piles, which act as both foundations and substructure elements for a bridge's interior bents, and the first widespread use of rock-socketed drilled shafts as bridge foundations on a TDOT project.The pipe piles were used at a site with significant cavities within the limestone bedrock. This resulted in design verification and constructability difficulties that required delays, but measures were ultimately employed to produce a sound foundation system. Over 110 drilled shafts have been constructed at sites with generally low solution activity. Relative to H-pile footings, which were included as an alternate foundation, they have apparently allowed accelerated construction at a competitive cost.
机译:威尔伯·史密斯公司(WSA)已向田纳西州交通运输部(TDOT)提供了三个建筑项目的规划,工程和施工监督协助,这些项目旨在扩大和改善田纳西州诺克斯维尔的1-40级公路和相关交汇处。这些项目位于山谷和里奇省的喀斯特地貌内。地下条件的特征是不规则的岩石表面加上不同的风化作用。由于该项目对当地和州际驾车者的影响,因此考虑了可以加快施工速度的创新性规划,材料和施工方法。两项创新的深层基础措施包括:嵌岩管桩既是桥梁内部弯曲的基础又是子结构元素;在TDOT项目中首次广泛使用嵌岩钻孔轴作为桥梁基础。在石灰岩基岩内有大量空洞的地方。这导致设计验证和可施工性方面的困难,需要延迟,但最终采取了措施以产生良好的基础系统。在固溶性通常较低的现场建造了110多个钻孔井。相对于作为替代基础的H桩立足点,它们显然允许以有竞争力的成本加快施工速度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号