首页> 外文会议>Improvements in Reservoir Construction, Operation and Maintenance >Reservoir Safety and Refurbishment Works at Severn Trent Water's Howden, Deiwent and Linacre Reservoirs
【24h】

Reservoir Safety and Refurbishment Works at Severn Trent Water's Howden, Deiwent and Linacre Reservoirs

机译:Severn Trent Water的Howden,Deiwent和Linacre水库的水库安全和整修工程

获取原文

摘要

Severn Trent Water (STW) initiated a contract for essential reservoir safety and refurbishment works following a routine 10 year inspection, under Section 10(2) of the Reservoirs Act 1975. The required works were varied and included, valve refurbishment, additional valves, spillway repairs and general maintenance work. At Howden and Derwent Reservoirs there was concern that operation of 9no. 30 inch diameter Blakeborough scour valves was causing cavitational damage and some valves could not be operated through their full travel. It was recommended that further investigations were carried out 'in the interests of safety'. At the Linacre Reservoirs (Upper, Middle and Lower) the works to be carried out, some 'in the interests of safety' and others for refurbishment, included repairs to spillway walls and floors, restoration of a drainage facility, installation of a scour guard valve and re-lining of the Lower Reservoir draw-off scour pipeline. This paper reviews the works involved from the early feasibility investigations through to the construction works. The construction period was August 2005 to March 2006.
机译:Severn Trent Water(STW)根据1975年《水库法案》第10(2)条进行了为期10年的例行检查后,启动了基本水库安全和整修工程的合同。所需的工程有所不同,包括阀门整修,附加阀门,溢洪道。维修和一般维护工作。在豪顿水库和德文特水库,人们担心9no的运行。直径30英寸的Blakeborough冲气阀造成气蚀,某些阀在其整个行程中无法操作。建议“为了安全”进行进一步调查。在利纳克雷水库(上,中,下),将进行一些工作,“为了安全”,而进行其他翻新工作,包括对溢洪道墙壁和地面的维修,排水设施的修复,防冲刷装置的安装。下水库排泄冲刷管道的阀门和衬里。本文回顾了从早期可行性研究到建筑工程所涉及的工程。施工期为2005年8月至2006年3月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号