首页> 外文会议>International Conference on Industrial Engineering and Engineering Management >A dynamic mechanism of risk allocation of construction project from perspective of incomplete contract theory: A theoretical model
【24h】

A dynamic mechanism of risk allocation of construction project from perspective of incomplete contract theory: A theoretical model

机译:不完全合同理论视角下建设项目风险分配动态机制:理论模型

获取原文

摘要

Proper risk allocation (RA) can promote project management performance by means of contract clauses, but the existing researches were mainly on the philosophy of one-time and static RA, which hindered the project management performance improvement persistently. On the basis of literature review, the paper pointed out the characteristic of dynamic RA , and further analyzed the RA contract clauses of incomplete contract nature, and established a theory model of dynamic RA in construction project which includes initial RA and risk reallocation, which has important significance on reasonable RA in the process of contract negotiation between the project owner and the contractor.
机译:适当的风险分配(RA)可以通过合同条款促进项目管理绩效,但现有的研究主要是一次性和静态RA的哲学,这阻碍了项目管理绩效的持续改进。在文献综述的基础上,纸张指出了动态RA的特征,并进一步分析了不完全合同性质的RA合同条款,并在建设项目中建立了动态​​RA的理论模型,包括初始RA和风险重新分配项目业主与承包商合同谈判过程中合理RA的重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号