REHABILITATION TO REDUCE PIPING POTENTIAL IN THE SKELTON DAM ARTESIAN PRESSURE DRAINAGE SYSTEM

机译:进行恢复以减少SKELTON DAM自流压力排放系统中的管道电位

获取原文

摘要

This paper discusses rehabilitation efforts at an embankment dam with an aging foundation pressure relief system. Six of the fifteen relief wells that make up the system have historically discharged water transporting some sand. The condition of the five aging wells (circa 1940s), the difficulty to access and monitor the wells, and the history of soil transport from the wells resulted in the owner implementing remedial efforts with varying levels of success. Finally in 2005, the five relief wells, which could only be accessed using confined space measures, were decommissioned. This paper discusses the events leading up to the decommissioning of the relief wells and methods used for decommissioning.
机译:本文讨论了具有老化基础泄压系统的堤坝的修复工作。组成该系统的15口救济井中有6口在历史上已经排放出水,运送了一些沙子。五个老化井的状况(大约在1940年代),进入和监控井的困难以及井中土壤运输的历史,导致业主实施了补救措施,并取得了不同程度的成功。最终在2005年,仅使用受限空间措施才能进入的5口救济井退役。本文讨论了导致救济井退役的事件以及退役方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号